HEMSEDAL
Bike park 6.8 km
Playful flow trail made from local granite
In 2021, we worked as a subcontractor for a trail construction team managed by Trailtools.eu as trail designers and machine operators.
This trail construction was a project in alpine, rocky and often wet terrain and therefore a very challenging job. Due to the unfavorable and unstable ground conditions on site, we opted for a three-layer construction of the roadway made of local granite.
The end result is a very playful and varied flow trail that stands out thanks to these characteristics.
Gerne unterstützen wir auch Sie bei Ihrem Projekt.
Jetzt unverbindlich Kontakt aufnehmen und mit unseren Experten über Ihr Vorhaben sprechen.